Toowoomba-Cecil Plains Road interchange

As part of work on the Toowoomba Second Range Crossing, a grade separated interchange will be constructed at Toowoomba-Cecil Plains Road, Wellcamp.


toowoomba-cecil-plains-road-wellcamp


Building the Toowoomba-Cecil Plains Road interchange

Works involve constructing:

  • two on-ramps, enabling motorists to access the Toowoomba Second Range Crossing in both directions
  • two off-ramps, enabling eastbound and westbound motorists to exit the Toowoomba Second Range Crossing
  • a three-span bridge, taking the road bypass over Toowoomba-Cecil Plains Road
  • two signalised intersections to enhance safety for all road users.

A 1.1km long section of Toowoomba-Cecil Plains Road, Wellcamp will be upgraded to accommodate the new interchange.

Access to Brisbane West Wellcamp Airport

Construction of a direct off-ramp to Brisbane West Wellcamp Airport was not included in the State reference design and does not form part of Nexus’ design solution. The Toowoomba-Cecil Plains Road interchange will serve as a connection point and is located approximately two kilometres from the airport.

Download the Toowoomba-Cecil Plains Road interchange factsheet


Construction updates

Works to construct the Toowoomba-Cecil Plains Road interchange at Wellcamp are anticipated to occur from late 2016 until mid-2018. Local residents will be kept updated about construction time frames.