Warrego Highway west interchange

As part of work on the Toowoomba Second Range Crossing, a grade separated interchange will be constructed at the Warrego Highway, Charlton.


Toowoomba-Second-Range-Crossing-Warrego-Highway-West-Charlton


Building the Warrego Highway west interchange

This involves constructing:

  • two on-ramps, enabling motorists to access the Toowoomba Second Range Crossing in both directions
  • two off-ramps, enabling eastbound and westbound motorists to exit the Toowoomba Second Range Crossing
  • a bridge, taking the Toowoomba Second Range Crossing over the Warrego Highway
  • three signalised intersections to allow road users to safely turn in and out of the Toowoomba Second Range Crossing, Nass Road and Wirth Road.

Construction of the Warrego Highway west interchange will also involve permanently closing Willett Road at its intersection with the Warrego Highway. Access for local Willett Road residents and Toowoomba Speedway visitors will continue via Wirth Road.


Construction updates

Works to construct the Warrego Highway interchange at Charlton are anticipated to occur from early 2017 until mid-2018. Local residents and businesses will be kept updated about construction time frames.

Download the Warrego Highway west factsheet