Project Hotline
1800 198 878*

News

25 October 2018
| Videos

Toowoomba Second Range Crossing Final Controlled Blast – September 2018

Toowoomba-Second-Range-Crossing-NEH-September-2018

The final controlled blast occurred along the TSRC project in September 2018!

For more videos visit our YouTube channel

Stay Connected.
Keep up-to-date with the progress of the Toowoomba Second Range Crossing.